Location:Southington, CT Project:Southington Meter Station Capacity:4,000 MCFH
This custody transfer facility required CHI to develop a high flow facility that met the design requirements of El Paso Energy and Yankee Gas while achieving the low sound levels required in a suburban residential neighborhood. CHI provided all permitting and land acquisition as well as design-build services for the client.