South Jersey Gas Company
Vaporization Replacement

Location: McKee City, NJ
Project: Vaporization System
Capacity:
60 MMSCFD

CHI replaced three existing 20 MMSCFD direct fired vaporizers with a single remote heated 6- MMSCFD remote heated shell and tube vaporization system.  The vaporization system consits of; one 60 MMSCFD (2500 MSCFH) vertical shell and tube vaporizer, two 700 BHP water/glycol heaters, two 40 hp water/glycol circulating pumps, a 6,000 gallon water/glycol expansion/storage tank, make-uppumps, a new motor control center, instrumentation and control system, emergency shutdown system, fire and combustible vapor detection system, a new odorization system, and a new metal sided building which houses the heaters, motor control center, circulating pumps, water/glycol storage tank, make-up pumps, and a new control room.

   

 

 

 

 

 

 

 <- Previous

Project page Next ->


CHI ENGINEERING SERVICES, INC.
430 West Rd Portsmouth, NH 03801 1-800-437-1995 or 603-433-5654
fax: 603-431-1721 Email: info@chiengineering.com

Website designed by: Harbour Light Strategic Marketing
Web Content Management Powered by Savvy CM