Location:Weymouth, MA Project:Weymouth Meter Station Capacity: 2,200 MCFH
This custody transfer facility on the shores of the Fore River in Weymouth, MA was safely built while the adjacent high pressure station remained in service. The design included a hot tap on the transmission line, metering, preheat, pressure regulation, odorization and control equipment that exceeded the requirements of both Duke Energy and Keyspan Energy Delivery.