 | - Meter Station
Location: Berlin, CT
Project: Berlin Meter Station
Capacity: 4,000 MCFH
CHI personnel provided the permitting and land acquisition of this new Duke Energy / Yankee Gas joint facility. CHI performed the site civil, mechanical, and electrical design for the unique flow control requirements from two natural gas transmission lines. |  |