 | - Meter Station
Location: Lakeville, MA
Project: Middleboro Prefabricated Meter / Regulator Station
Capacity: 100 MCFH
CHI designed and built this custody transfer facility to provide a vital new gas supply to Middleboro Gas and Electric from Bay State Gas. The installation consists of four below grade vaults containing filtering, metering, flow control, and well as pressure regulation and overpressure protection. Prefabrication allowed for an expedited schedule and minimal site disruption. |  |