 | - Vaporization Replacement and Truck Unloading Facility
Location: Haverhill, MA Project: Vaporization and Truck Unloading
Facilities Capacity: 20 MMSCFD, Dual Truck Unloading
The Haverhill LNG facility vaporization and truck station upgrade consists of the installation of a new 20 MMSCFD LNG vaporizer, a new dual truck unloading station, and a new sub-impoundment system which services the existing Thermoflux vaporizer (H-3), the new Thermoflux vaporizer (H-4) and the new truck unloading station. The truck unloading station has the capability to unload two trucks with a maximum unloading rate of 300 GPM when unloading a single truck and a rate of 200 GPM per truck when unloading two trucks simultaneously.
|  |